FSE215, Stockholm Bypass

Client

Comsa Sverige AB

Time

02.2021 - 06.2022

Budget

30.000.000 SEK

Description

Cast in-situ concrete works in lines 211 and 212. Each line includes a concrete portal
between the concrete tunnel and a rock tunnel, a concrete tunnel and an open
concrete frame (tråg) as well as escape route with a staircase.